Responsible Agency:
DOT
Description:
Any person/organization who intends to sponsor construction or alterations that fall under activities listed under CFR Title 14 Part 77.9 must notify the Administrator of the FAA via a Notice of Proposed Construction - Form 7460. This notice includes a plan for appropriate markings and lighting, after which FAA makes a Hazard Determination for the proposed construction.
Activity/Trigger:
Construction/alteration of structures >200 ft or near airports, depending on distinction and length of nearby runway; siting within radar line-of-sight of air surveillance or communications facility
Statute or Regulations:
Structures interfering with air commerce (49 USC 44718)